top of page
![LinkedIn_Image_coomera connector stage 1 corridor.jpg](https://static.wixstatic.com/media/dc89a0_b368bd666168411b894e7f1f30bd8ee1~mv2.jpg/v1/fill/w_980,h_1385,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/dc89a0_b368bd666168411b894e7f1f30bd8ee1~mv2.jpg)
LinkedIn_Image_coomera connector stage 1 corridor.jpg
![LinkedIn_Image_coomera connector stage 1 corridor.jpg](https://static.wixstatic.com/media/dc89a0_b368bd666168411b894e7f1f30bd8ee1~mv2.jpg/v1/fill/w_980,h_1385,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/dc89a0_b368bd666168411b894e7f1f30bd8ee1~mv2.jpg)
LinkedIn_Image_coomera connector stage 1 corridor.jpg
1/1
COOMERA CONNECTOR CENTRAL - STAGE 1
PROJECTS
The $2.16BN Coomera Connector Stage 1 is Queensland's largest road infrastructure project. This nation building project is set to alleviate long travel times and congested traffic along the critical path and removing up to 60,000 local trips a day from the M1 Pacific Motorway.
CGC is delivering the geotechnical design and site investigations for all bridges, retaining walls and ground improvements for the Coomera Connector Central - Stage 1.
The central section between Helensvale Road and Smith Street Motorway will deliver a 6-lane, 8km section with 22 bridges. It includes new interchanges, modifications to overpasses, hydraulics and complex geotechnical improvements.
Project Description
Gallery
bottom of page